Oral variation to written contract
Written contracts can be varied orally post-signature unless they specifically state to the contrary.
The case of MWB Business Exchange Centres v Rock Advertising illustrates the point.
A property landlord was found by the Court of Appeal to have wrongfully excluded a tenant who was in rent arrears, having earlier orally agreed to stay its hand.
The tenant, who was about £12,000 in arrears of licence fees and other charges, was locked out of its serviced offices by the landlord. The latter’s claim to payment of the arrears was upheld by a judge and the tenant’s counterclaim that it had been entitled to remain in occupation of the premises was rejected.
In upholding the tenant’s challenge to that decision, however, the Court found that an oral agreement by which the landlord accepted that payment of the arrears could be rescheduled and that the tenant could remain in occupation in the interim was binding on both parties.
The tenant successfully argued that there was nothing in the licence agreement which precluded its oral variation at a later date. Its agreement to pay £3,500 of the debt straight away, and to make arrangements for payment of the arrears in full over time, was sufficient consideration to make the oral variation enforceable.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Editor's broadbrush view on forms of electrical heating in context.
The pace of heating change; BSRIA market intelligence
Electric Dreams, Boiler Realities.
New President of ECA announced
Ruth Devine MBE becomes the 112th President of the Electrical Contractors Association.
New CIAT Professional Standards Competency Framework
Supercedes the 2019 Professional Standards Framework from 1 May 2025.
Difficult Sites: Architecture Against the Odds
Free exhibition at the RIBA Architecture Gallery until 31 May.
PPN 021: Payment Spot Checks in Public Sub-Contracts
Published following consultation and influence from ECA.
Designing Buildings reaches 20,000 articles
We take a look back at some of the stranger contributions.
Lessons learned from other industries.
The Buildings of the Malting Industry. Book review.
Conserving places with climate resilience in mind.
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.